The situation

A design gets built, shipped, and then somebody senior says “wait, this conflicts with what the payments team is doing.” That objection existed at design time. It did not surface because there was no forum, or because the forum was a meeting where nobody wanted to be the one slowing things down.

The purpose of a design review is not approval. It is making disagreement cheap and early.

The default

Written proposal, asynchronous comment period, then a meeting only if unresolved.

The written document does most of the work. Writing a design down forces precision that a conversation allows you to skip, and roughly a third of proposals get materially improved by the author during the writing, before anyone else reads them.

A workable template:

  # RFC: <title>

Author, date, status (draft / in review / accepted / rejected / superseded)
Reviewers: <named people, not "the team">

## Problem
What is broken or needed. Include the evidence — numbers, incidents,
customer requests. If you cannot state the problem without describing
the solution, you do not have the problem yet.

## Constraints
Deadline, team size, existing systems, compliance, budget.
(See /docs/foundations/constraints-first/)

## Proposal
What you intend to build. Diagrams at one level of abstraction.

## Alternatives considered
At least two, each with why it was rejected. "Do nothing" is always
one of them.

## Trade-offs
What this buys and what it spends. Name the qualities explicitly.
(See /docs/foundations/trade-off-sliders/)

## Risks and open questions
The parts you are least sure about. Be honest — this is where reviewers
add the most value.

## Rollout and rollback
How this gets deployed and how it gets undone.
  

The “Risks and open questions” section is the one that determines whether the review is useful. An RFC presenting a fully-confident design invites rubber-stamping. One that says “I am not sure about the failure behaviour here” directs expert attention exactly where it is needed.

Making disagreement safe

flowchart TD
    A["Author writes RFC"] --> B["Async comment period<br/>3-5 working days"]
    B --> C{"Unresolved<br/>disagreement?"}
    C -->|No| D["Accepted.<br/>Summary → ADR."]
    C -->|Yes| E["Meeting: only the<br/>open points,<br/>only the people<br/>who disagree"]
    E --> F{"Resolved?"}
    F -->|Yes| D
    F -->|No| G["Named decider decides.<br/>Dissent recorded<br/>in the ADR."]
    style D fill:#2d7,stroke:#0a5,color:#000

Two things make this work:

  • A named decider, agreed in advance. Design by consensus stalls on the first genuine disagreement, and stalling is usually worse than either option. Someone decides; the dissent is recorded rather than suppressed.
  • Recorded dissent. “The payments team disagreed with this and expected X to be a problem” is enormously valuable eighteen months later, whether or not X turned out to be a problem.

Scoping who reviews

Reviewing everything is how review processes die. Scope by irreversibility:

ScopeReview
Inside one team, reversibleCode review, no RFC
Inside one team, hard to reverseRFC, reviewed within the team
Affects another team’s contractRFC, that team is a named reviewer
Cross-cutting: security, data model, platformRFC, plus the relevant specialist
New external dependency or vendorRFC, plus whoever owns the commercial and security review

Naming specific reviewers rather than broadcasting to a channel matters. A document sent to everyone is reviewed by nobody.

Anti-patterns

  • Review as gate rather than as improvement. If the outcome is always “approved” the process is theatre; if it is frequently “rejected after weeks” the review is happening too late.
  • Reviewing a design that is already built. Common, demoralising, and guarantees that feedback is ignored. Review before implementation starts, or do not review.
  • Bikeshedding. Reviewers commenting on naming and formatting while the consistency model goes unexamined. The template’s Risks section helps direct attention.
  • No time limit. An RFC open for six weeks is blocking someone. Publish the comment window and close it.

When the default is wrong

Small teams working closely do not need a written RFC for every design; a conversation and an ADR afterwards captures the same value with less process.

Urgent work sometimes has to skip review. That is legitimate, and the honest version is to write the RFC afterwards, marked as retrospective, so at least the reasoning is recorded.

What it costs

An RFC is a day of writing plus a week of latency. For decisions that turn out to be easy, that is pure overhead — and you cannot always tell in advance which those are.

The mitigation is proportionality: a one-page RFC for a medium decision is fine, and the process should explicitly permit it. A template that demands ten sections for every change trains people to route around the process entirely.