Schema Migrations Without Downtime
Every schema change is a distributed system problem, because old and new code run at the same time.
The situation
You need to rename a column, split a table, add a constraint, or change a type. During the deploy, old code and new code both run against the same database. Whatever you do must be correct for both, simultaneously, in both directions — because you might roll back.
The default
Expand, migrate, contract — the same shape as API contracts, applied to storage. Never change a column in place.
Renaming user_name to username, done properly:
flowchart TD
A["1. Add username column<br/>(nullable, no default)"] --> B["2. Deploy code that<br/>WRITES both, READS user_name"]
B --> C["3. Backfill username<br/>in batches"]
C --> D["4. Deploy code that<br/>WRITES both, READS username"]
D --> E["5. Verify: no reader<br/>of user_name remains"]
E --> F["6. Deploy code that<br/>writes only username"]
F --> G["7. Drop user_name"]
style A fill:#2d7,stroke:#0a5,color:#000
style G fill:#f77,stroke:#c00,color:#000
Seven deploys to rename a column. That is not overhead — that is what correctness costs when you cannot stop the world. Each step is independently safe to roll back, which is the property you are buying.
For a system that can take a maintenance window, one ALTER TABLE is fine.
Be honest about which you are.
Operations that lock, and what to do instead
The failure most people meet first is not logical but operational: a migration that takes a lock and stalls every query behind it.
| Operation | Danger | Safe approach |
|---|---|---|
| Add column with a non-null default | Table rewrite on older engines | Add nullable, backfill in batches, then set default |
| Add index | Locks writes | CREATE INDEX CONCURRENTLY (Postgres); online DDL (MySQL 8+) |
Add NOT NULL | Full table scan under lock | Add a CHECK … NOT VALID, validate separately, then convert |
| Add foreign key | Locks both tables | NOT VALID then VALIDATE CONSTRAINT |
| Change column type | Rewrite | New column, dual-write, backfill, swap |
| Drop column | Breaks old code on rollback | Stop reading, deploy, wait a release, then drop |
| Long backfill in one statement | Holds a transaction open, bloats WAL, blocks vacuum | Batch it: 1000 rows, commit, sleep, repeat |
Also: set a lock timeout on migrations. A migration that waits for a lock behind a long-running query, while new queries queue behind the migration, is the classic way to take an outage with a change that “was just adding an index.”
SET lock_timeout = '3s';
SET statement_timeout = '30s';
Fail fast and retry, rather than blocking the world.
Rules that prevent most incidents
- Migrations deploy separately from code, and always before it (for expands) or after it (for contracts). Coupling them into one artifact removes your ability to roll back one without the other.
- Migrations are forward-only. Down-migrations are a lie in production — you cannot un-drop data. Roll forward with a new migration.
- Backfills are jobs, not migrations. Restartable, rate-limited, observable, and safe to run twice.
- Test the migration against a production-sized copy. A migration that takes 200ms on 10,000 rows can take 40 minutes on 200 million.
When the default is wrong
Small internal tools, pre-launch systems, and anything with a legitimate
maintenance window do not need seven steps. The ceremony is proportional to the
cost of downtime and the number of concurrent code versions. One deployable, no
users at 3am, and a two-minute window: just run the ALTER.
What it costs
Dual-write periods mean the two columns can diverge if any writer is missed — a background job, an admin script, a reporting ETL, a database trigger. Find every writer before step 2, not during step 5.
Long-lived expand phases also accumulate: a codebase where six migrations are stuck at “step 4 of 7” is confusing and each unfinished migration is a small correctness hazard. Schedule the contract step when you start the expand.